The crane is loaded with the timbers for the frame for the Charlestown Package Store. An eight mile trip for a life time of beauty. This endeaver is truly exciting.
Here is our crane operator, Chris, helping to raise the back wall of the store.
The
South County Post & Beam
crew works well together erecting the frame.
The crane effortlessly sets the king post truss into place. This frame was designed and installed by
South County Post & Beam
.
Contact us